The installation time can vary from job to job and is dependent on factors such as permit requirements, work conditions and project size.
As a rough guide for a small residential job with permit requirements, the design, engineering and permit application can take around 4 weeks. From there, the manufacturing, supply and installation takes around 3-4 weeks.
Time frames are completely job dependent. The team will be able to give you a rough estimate of lead times after quoting. Looking at our recent projects may also give you an indication of timings.